IRAM 2502 PDF

In a complex, globalized and full of uncertainties as the current world, it is almost essential, to act with efficiency and Celerity in obtaining successful results for. IRAM. Subreflector Software. Change Record. REVISION. DATE. AUTHOR .. For the subref software, CanManager must listen on ports IRAM (2). September 13, | Author: mscaponetto | Category: Pipe (Fluid Conveyance), Pump, Energy And Resource, Nature, Science.

Author: Dirisar Malazilkree
Country: Switzerland
Language: English (Spanish)
Genre: Education
Published (Last): 19 November 2015
Pages: 275
PDF File Size: 9.15 Mb
ePub File Size: 19.51 Mb
ISBN: 391-5-39547-850-3
Downloads: 93764
Price: Free* [*Free Regsitration Required]
Uploader: Nekus

Long, Iram, Nipple rosc. No, firms, Mm pl.

Las redes de hidrantes aceptadas en esta norma son redes abiertas iran en anillo con hidrantes y bocas de incendio de 65 mm que deben estar equipados con mangueras de 65 mm. Incluye a modo de ejemplo: IRAM – Servicio de mantenimiento de instalaciones fijas contra incendios.

Leave a Reply Cancel reply Your email address will not be published. Size px x x x x Las cargas de fuego son bajas y irwm. Long, various, Nipple rosc.

Dispositivo de suministro de agua de la red para la lucha contra incendios, ubicado en el exterior de los edificios. Spherical, elbow, Reduction bushing, Roots meter, Normal tee, Nipple rosc.

TOP Related Articles  ABE HAYAT NOVEL BY UMERA AHMED PDF

Long, Mbar pressure gauge, Valv.

Welded Pipes – IRAM 2502

Raw text data extracted from CAD file: The room that houses ieam plant responds to what is indicated in the regulation point any increase in the declared consumption must be requested through the participation of a registered installer of category, Minimum flow time future, Minimum possible flow, Pub, flow rates, Maximum hours worked, Maximum flow rate 2052 schedule, Minimum flow, Maximum flow rate, Pub, Regulated pressure in primary plant, Working pressure in burners, Pub, Idam supply pressure, Minimum supply pressure, Pub, note, Flow sheet, Pressures, Pub, scale, view, scale, plant, Lamadrid, Blow, Guys, Balcarce, P.

Please help us to share our service with your friends. Add to Cart Checkout Added to cart. De no estar cubiertos por estas normas deben tratarse de materiales certificados por organismos reconocidos internacionalmente.

Drawing labels, details, and other text information extracted from the CAD file Translated from Spanish: Please copy and paste this embed script to where you want to embed Embed Script. Las mangueras pueden enrollarse en portacarretes.

A modo de ejemplo: Para los fines de la presente norma, se aplican las definiciones siguientes: We are a non-profit group that run this website to share documents. Aquellos aspectos cubiertos por la Ley Please fill this form, we will try to respond as soon as possible.

TOP Related Articles  LM2577T DATASHEET PDF

Welded Pipes – IRAM – Acerotub

El tanque no debe estar igam. Para los hidrantes equipados con mangueras de 45 mm debe ser 20 m. El largo debe ser de 25 m para mangueras de 65 mm y de 20 m para manguera de 45 mm. No reemplazan al hidrante.

Welded pipes

En este caso se incluyen las actividades con cargas de fuego moderadas y altas. Conjunto de boca iramm incendio, manga, lanza, soporte para manga, gabinete y accesorios.

Thank you for interesting in our services. IRAM – Gabinetes para mangas de incendio. El uso de mangueras de 45 mm se acepta en los casos siguientes: We need your iraj Se trata de actividades con cargas de fuego de altas a muy altas, que incluyen materiales combustibles e inflamables.

En caso de que no hubiese aberturas se deben instalar sobre la pared perimetral interior. Your email address will not be published.

We need your help to maintenance this website.